Punjab Pollution Control Board

The Punjab pollution control board was shaped in the year 1975 vide notice no. 6186-BR-11 (4) 75/24146 by the public authority of Punjab. The board was formed after the sanctioning of Water Prevention and Control of Pollution Act to save and work on the natural quality of water. Accordingly, with the approval of other environment laws by the focal and the state government, extra obligations were given over to the board comparable to their execution in the state.

The preeminent goal of the pollution board is to execute environment related laws and decreasing pollution whether it is as water, air, unsafe waste, e-squander, biomedical substances, commotion pollution and plastic waste in the state. The board prompts the state government with steps that are to be taken to subside and limit pollution in the state and structure strategies for the guideline of industrial pollution. The board can issue show cause notice from the defaulting industries. Furthermore, can even issue closure orders or fines are enforced on such defaulting industries.

A few environmental natural laws which are executed by the pollution board are -

  • The water cess Act, 1977

  • The hazardous waste guidelines, 1989

  • Municipal solid waste standards, 2000

  • Noise pollution Act

  • Recycled plastic guidelines, 1998

  • The air prevention and control of pollution Act

  • The water prevention and control of pollution Act

The board is entrusted to handle and control pollution at the wellspring of its release. The board limits pollution by giving consent to establish new industries and furthermore restores the same. Consent to establish is allowed by thinking about the local locations close to the task. The board additionally prompts the state government with the setting of industrial zones and even gives idea corresponding to the migration of currently settled industries. It guarantees that normal waters are not polluted. It even makes mindfulness among overall population and industries concerning environment pollution.

Understand Consent to Establish

The board has outlined principles, rule, and strategies with respect to consent to be received before an industry is set up. It has smoothed out the methodology to concede legal clearances opposite environment laws with the goal that industry visionaries can set up enterprises in Punjab in a simple and stress-free way.

Classification of Industries

The board has sorted industries into three classes

  • Red – Highly polluting industries

  • Golden/orange – Medium polluting industries

  • Green – Less polluting industries

  • White – Minimum polluting industries, they are absolved from taking consent.

On the off chance that industry is excluded from any of the previously mentioned classes, then, at that point, a board of trustees of Senior environment engineer, Environment engineer, and Scientific official will aggregately conclude the classification the left out industry will get in.

Required Guidelines for seeking Consent to Establish Certificate

  • Another industry falling in Red, Orange, Green, or White will not be permitted to set up within the approved human habitant.

  • No industry falling in red class will be permitted to build up within the restrictions of Municipal Corporation with the exception of on the off chance that the region has been assigned as Industrial zone by the state.

  • Another industry needs to set up 100 meters from the local location containing 15 pucca houses, city or town, Municipal Corporation or town.

  • Consent to establish must be acquired assuming the industry is 500 meters from eco-touchy zones.

Required Documents for seeking Consent to Establish (NOC) in a Fresh Application

  • Site plan alongside the particular area of the industry.

  • Duplicate of MOU of organization, partnership deed on the off chance that it is a partnership firm.

  • Reports connected with land like registration deed, jamabandi, and lease deed.

  • Offer letter by the authority assuming the task is situated in an industrial zone or point of convergence.

  • For industries situated in an assigned industrial zone, an undertaking by the industry applying that it has received consent to establish in the assigned industrial zone from an assisted government office.

  • A duplicate of industry-explicit rules or certificate related to the particular industry.

  • Project report alongside complete creation stream diagram.

Renewing or Extending Consent to Establish permission

Standards have been separated in -

Red And Orange Category

  • Consistence report of consent condition allowed before.

  • Report of discharges and effluents given by the public authority endorsed lab.

  • Certificate received from the CA of the un-depreciated fixed assets toward the completion of the financial year.

Green Category

  • Consistence report of past Consent to establish provided by the board.

  • Certificate received from the CA of un-depreciated fixed assets toward the completion of financial year.

Issuing the Clearance Certificate and Notice if the Industry is a Defaulting Industry

Clearance certificate

Clearance certificate issued by the board won't be an essential for getting power connection by the industry.

The industries are additionally separated into huge/medium and small ventures -

  • Limited scope industry is given leeway by Environment engineer under the green class, and under red and orange classification it is given by Senior environmental engineer.

  • Enormous industry falling under red class having an undertaking cost of INR 15 crore or more are conceded by the Chief environment engineer.

Notice if any contravention occurs related to environment law

  • Notice related to water and air pollution Act will be given with earlier permission granted by the Chairman of the board.

  • Notice under Environment security act will likewise be given with earlier permission granted by the Chairman of the board.

Timeframe for Issuance of Consent to Establish by the Board

  • The time-frame to get Consent to establish for the green classification is 15 days, and for orange classification it is 21 days from the date of applying and providing all required and appropriate records.

  • Leeway certificate and consent to operate for red classification, is 30 days from the date of applying and providing all required and appropriate records.

Process of seeking Pollution Control Consent, NOC Or License with Estabizz

  • Associate with our group

  • Submit vital documents

  • Assigning specialists to your case

  • Meeting by specialists and completion of process involved

  • Drafting and Filing of Application with Pollution Board

  • Conveyance of the Consent Certificate/CTE/CTO

Miscellaneous

  • At the hour of giving consent to operate, the provincial office of the board will stamp and indicate the approved outlet of producing pollution both air and water, the official denoting the outlet will likewise be a visiting and inspection official of that industry.

  • CCTV camera will be equipped for observing web-based reconnaissance of pollution of exceptionally polluting enormous industries.

  • Pollution control board will take pictures of pollution transmitting from the industries, and that record will be saved for minimum of a month. Furthermore, these photos can be utilized as proof against defaulting industries.